Process shots from Adam’s 29+

Adam’s frame is 95% done. I just need to cap the wishbone stay ends, put on a few cable guides, ream/face, and clean up before posting any final parting shots.  It was a challenging build not just because the bent tubes but because it was so interrupted by time away from the shop. I have to say, if i wanted a custom 29+ this is what I’d order too.  Maybe with internal cables though.  I’ll post geometry and more details when I post the ‘final’ shots before it goes to paint. But for now here are some process shots for the FB dorks out there.


Discover more from Meriwether Cycles

Subscribe to get the latest posts sent to your email.

3 thoughts on “Process shots from Adam’s 29+

Add yours

    1. Chainstay length isn’t too short actually on this frame: ended up being 439 actual (17″ effective length – horizontal to the ground). The frame’s got 70mm of BB drop to lower the BB a tad more than the Krampus (65mm drop). I think I should be able to run 2.4’s on the frame too and get a BB height hovering around 12″ which should be good for bikepacking.

Leave a Reply to gypsybytradeCancel reply

Powered by WordPress.com.

Up ↑

Discover more from Meriwether Cycles

Subscribe now to keep reading and get access to the full archive.

Continue reading